TN-020 β Consolidate Diagnostic MVP Portfolio and Plan Monitoring Platform Integration Phase¶
| Field | Value |
|---|---|
| Status | Completed |
| Outcome | Portofolio capaian teknis dan arsitektur fase Diagnostic MVP Pilot (TN-001 s/d TN-019) berhasil dikonsolidasikan ke halaman-halaman utama DevOps Handbook, exit criteria pilot dinyatakan 100% terpenuhi dan live-verified di devops-lab, aset arsitektur 5-layer KB disintesis, dan roadmap fase Monitoring Platform Integration serta follow-up tasks backlog diformalkan secara terstruktur. |
| Activity Type | Documentation Consolidation |
| Record Type | Live |
| Project | Tomcat Monitoring |
| Phase | Diagnostic MVP Pilot |
| Activity Date | 2026-09-03 |
| Recorded Date | 2026-09-03 |
| Owner | Project owner / Eddy Wiyatno |
| Working Mode | Write |
| Authorization Status | Portfolio consolidation, core documentation promotion, exit criteria formal closure, and platform integration roadmap approved/executed |
| Approved By | Eddy Wiyatno |
| Approval Date | 2026-09-03 |
π― Objective¶
Mengkonsolidasikan seluruh portofolio capaian teknis dan arsitektur dari fase Diagnostic MVP Pilot (TN-001 s/d TN-019) ke halaman-halaman dokumentasi utama DevOps Handbook, memutakhirkan status sistem dari Planned/Pending menjadi 100% Completed and Live-Verified pada lingkungan persisten devops-lab, menyusun ringkasan aset arsitektur portofolio (5-Layer Knowledge Base & AI Enrichment Architecture), serta merumuskan perencanaan strategis untuk fase lanjutan (Monitoring Platform Integration Phase) dan backlog tugas kelanjutan (follow-up-tasks.md).
Target Utama & Kriteria Keberhasilan:
- Core Documentation & Architecture Promotion: Memutakhirkan 7 halaman utama DevOps Handbook (
index.md,architecture/index.md,development/index.md,infrastructure/index.md,diagnostic-mvp/index.md,engineering-journal/index.md, dan indeks fase) untuk mencerminkan status operasional live-verified. - Exit Criteria Formal Closure & Gap Resolution: Menutup seluruh kesenjangan teknis pada Gap Register dan menetapkan seluruh Exit Criteria fase Diagnostic MVP Pilot berstatus 100% terpenuhi.
- Architectural Portfolio Assets Synthesis: Menyusun ringkasan aset arsitektur inti: 5-Layer KB Architecture, Declarative Rulepack Engine, Append-Only Rules API, Deterministic RCA Engine (
TD-01..TD-09), Restricted Event Collector, dan 7-Section SRE Notification Presentation. - Follow-up Tasks & Platform Roadmap Formalization: Merumuskan roadmap strategis fase Monitoring Platform Integration (Dashboard Grafana, Standardisasi Log, Multi-Instance Scrape, Otomatisasi CI/CD Ansible, Enterprise Event Bridge) serta menyinkronkan daftar tugas kelanjutan (
follow-up-tasks.md). - Boundary: Dokumentasi handbook secara ketat membedakan antara fakta status runtime yang telah terbukti (proven runtime evidence) dengan perencanaan masa depan (future roadmap), menegakkan seluruh prinsip arsitektur TM-ADR-0001 s.d. TM-ADR-0017, menjamin sanitasi data tanpa kredensial rahasia, serta menyerahkan backlog operasional ke dokumen follow-up tasks tanpa modifikasi runtime yang tidak terotorisasi.
π Background¶
Fase Diagnostic MVP Pilot dimulai pada 2026-08-30 untuk menjawab tantangan operasional: bagaimana menghasilkan analisis akar masalah (Root Cause Analysis / RCA) secara deterministik dan otomatis ketika terjadi kegagalan layanan Tomcat (TomcatDown), tanpa bergantung pada tebakan probabilistik atau memberikan hak akses berbahaya (least-privilege isolation).
Sepanjang perjalanan dari TN-001 hingga TN-019, seluruh pilar arsitektur telah dirancang, diimplementasikan, dan diuji secara komprehensif:
- Pondasi Layanan & Keamanan (TN-001 s/d TN-013): Membangun tomcat-diagnostic-service berbasis Node.js 24 ESM, isolasi built-in SQLite node:sqlite, queue berbasis database dengan deduplikasi, worker asinkron, HTTPS TLS internal dengan bearer auth, dan adapter SMTP terisolasi.
- Integrasi Monitoring Persisten (TN-014 s/d TN-015): Mengonfigurasi rule Prometheus TomcatDown, Alertmanager sub-route & receiver webhook HTTPS, serta skrip otomatisasi deployment stack pada jaringan internal devops-lab.
- Restricted Event Collector & Verifikasi Insiden End-to-End (TN-016 s/d TN-017): Membangun repositori tomcat-diagnostic-event-collector, penulisan spool atomik .tmp ke .json, mount log/spool hanya-baca, dan pembuktian live siklus firing, diagnosis TD-06 (OOM Heap), persistensi SQLite, hingga notifikasi Mailpit dan resolved.
- Declarative Rulepack Engine & AI Enrichment Loop (TN-018 s/d TN-019): Membangun Strict Declarative Rulepack Engine, API penambahan aturan tanpa restart (POST /api/v1/rules), 5 lapis ingestion guard, immutabilitas append-only (405 Method Not Allowed), serta pembuktian siklus unknown incident (CannotGetJdbcConnectionException) -> UNDETERMINED -> ekstraksi forensik AI -> sintesis rule TD-09 -> hot-ingestion -> instant remapping diagnosis dan SOP mitigasi Bahasa Indonesia.
Dengan selesainya TN-019, fase Diagnostic MVP Pilot telah mencapai seluruh kriteria keberhasilan (Exit Criteria). Dokumentasi utama handbook perlu disinkronkan agar mencerminkan kondisi riil yang telah terverifikasi secara penuh.
π Scope¶
Scope yang disetujui mencakup:
- Konsolidasi Portofolio ke Halaman Utama Handbook:
- Memperbarui
docs/projects/tomcat-monitoring/index.md(Ringkasan kapabilitas, arsitektur terverifikasi, status komponen). - Memperbarui
docs/projects/tomcat-monitoring/architecture/index.md(Topologi terintegrasi, alur sekuensial, katalog komponen, kontrol keamanan). - Memperbarui
docs/projects/tomcat-monitoring/development/index.md(Tanggung jawab repositori, status image dan test). - Memperbarui
docs/projects/tomcat-monitoring/infrastructure/index.md(Komponen runtime persisten, alur jaringan, secret & certificate material). - Memperbarui
docs/projects/tomcat-monitoring/diagnostic-mvp/index.md(Penutupan fase pilot, status exit criteria). - Memperbarui
docs/projects/tomcat-monitoring/engineering-journal/index.mddan index fase terkait. - Dokumentasi Aset Arsitektur Utama:
- Menyajikan rekapitulasi arsitektur 5-Layer Knowledge Base dan alur deteksi deterministik.
- Menyajikan matriks keterlacakan dan status artefak seluruh repositori terkait.
- Perencanaan Fase Berikutnya (Monitoring Platform Integration):
- Merumuskan sasaran, ruang lingkup, arsitektur target, dan tahapan kerja fase integrasi platform monitoring pada
follow-up-tasks.md.
Exclusion: Eksekusi runtime deployment fase lanjutan (seperti konfigurasi Grafana, deployment Telegraf multi-node, dan otomatisasi Ansible) yang dialokasikan ke fase implementasi platform integration berikutnya.
π Prerequisites¶
| Prerequisite | State |
|---|---|
| Repositori Inti | tomcat-diagnostic-service, tomcat-diagnostic-event-collector, tomcat-monitoring, devops-handbook bersih dan sinkron |
| Technical Notes Baseline | Seluruh 19 Technical Note sebelumnya (TN-001 s/d TN-019) berstatus Completed |
| Persistent Lab Environment | Layanan pada lingkungan devops-lab aktif dan terverifikasi beroperasi normal |
| Decision Baseline | TM-ADR-0001 s.d. TM-ADR-0017 accepted |
| Node.js & Toolchain | MkDocs build environment aktif dan siap kompilasi |
| Implementation Authorization | Approved 2026-09-03 |
βοΈ Execution Decision¶
Implementasi ini secara ketat menegakkan keputusan arsitektur proyek:
- Kepatuhan TM-ADR-0001 s.d. TM-ADR-0003: Pengelolaan repositori terisolasi, runtime container berbasis Podman rootless, dan TLS material non-Git.
- Kepatuhan TM-ADR-0004: Pemisahan tegas antara status kegagalan aplikasi dengan kehilangan sinyal telemetri.
- Kepatuhan TM-ADR-0005 & TM-ADR-0006: Pembuktian verifikasi notifikasi Mailpit dan pengumpulan multi-sumber bukti deterministik.
- Kepatuhan TM-ADR-0008: Penegakan isolasi akses spool dan direktori log host secara strictly read-only (
ro,z). - Kepatuhan TM-ADR-0009 & TM-ADR-0013: Persistensi SQLite lokal menggunakan
node:sqlitebawaan Node.js 24 ESM. - Kepatuhan TM-ADR-0010: Penempatan bounded 1 instance Diagnostic Service per host Tomcat.
- Kepatuhan TM-ADR-0011: Pembakuan tabel keputusan per aturan (
TD-01s/dTD-09). - Kepatuhan TM-ADR-0014: Penegakan prinsip Zero Automatic Remediation di mana seluruh laporan menyediakan rekomendasi manual bagi tim SRE.
- Kepatuhan TM-ADR-0015: Penerimaan webhook asinkron dengan antrean SQLite kapasitas 50.
- Kepatuhan TM-ADR-0016: Penetapan Diagnostic Service sebagai otoritas tunggal pengirim email insiden enterprise.
- Kepatuhan TM-ADR-0017: Penerapan pendekatan Vertical Slice MVP dan penutupan resmi fase pilot.
- Strict Current-State Separation: Halaman utama dokumentasi handbook hanya memuat kapabilitas dan status yang telah terbukti (proven runtime evidence), membedakannya secara tegas dari rencana masa depan.
- Consistent Indonesian Narrative: Seluruh narasi konsolidasi disusun menggunakan standar penulisan Bahasa Indonesia formal Enterprise SRE yang konsisten dengan standar dokumentasi handbook.
- Formal Phase Closure: Fase Diagnostic MVP Pilot ditutup secara resmi dengan status
Completed, dan fase berikutnya (Monitoring Platform Integration) dicatat sebagai target kelanjutan project.
π Technical Workflow¶
Alur teknis audit status implementasi, promosi dokumentasi inti, sintesis aset arsitektur, dan perumusan roadmap masa depan:
%%{init: {'themeVariables': { 'fontSize': '12px' }}}%%
flowchart LR
subgraph AUDIT_GAP["1. State Audit & Gap Closure"]
direction LR
A["1. Review TN-001..TN-019<br/>(19 Completed Records)"] --> B["2. Verify devops-lab Runtime<br/>(Clean working tree)"]
B --> C["3. Close Gap Register<br/>(100% Exit Criteria Met)"]
end
subgraph DOC_PROMOTION["2. Core Doc Promotion"]
direction LR
D["1. Promote Architecture<br/>(Topologies & Components)"] --> E["2. Update Dev & Infra<br/>(v0.1.3 & Volumes)"]
E --> F["3. Update Project Indexes<br/>(Overview & Journal status)"]
end
subgraph ASSET_SYNTHESIS["3. Portfolio Asset Synthesis"]
direction LR
G["1. Map 5-Layer KB Flow<br/>(Deterministic to AI loop)"] --> H["2. Document RCA Catalog<br/>(TD-01 to TD-09 Table)"]
H --> I["3. Formalize SRE SOP<br/>(Structured Notification)"]
end
subgraph ROADMAP_FORMALIZE["4. Roadmap & Backlog Formalize"]
direction LR
J["1. Define 5 Roadmap Pillars<br/>(Grafana, Log, CI/CD, etc.)"] --> K["2. Update follow-up-tasks.md<br/>(TASK-TM-001..TASK-TM-011)"]
K --> L["3. Build & Publish Handbook<br/>(MkDocs & Rsync Sync)"]
end
Rincian Aktivitas Alur Kerja¶
1. Audit Status & Penutupan Gap Register (State Audit & Gap Closure)¶
- Pemeriksaan Konsistensi 19 Technical Notes: Mengonfirmasi bahwa seluruh 19 TN sebelumnya (TN-001 s/d TN-019) berstatus
Completeddan memiliki bukti verifikasi konkret. - Pemeriksaan Kesiapan Runtime: Memverifikasi bahwa container persisten
diagnostic-service,tomcat-jmx-exporter,prometheus,alertmanager, danmailpitaktif dan stabil pada jaringandevops-lab. - Penutupan Kriteria Keluar Pilot: Menutup seluruh Gap Register pada
docs/projects/tomcat-monitoring/diagnostic-mvp/index.mddan menyatakan seluruh kriteria kelulusan pilot 100% terpenuhi.
2. Promosi Dokumentasi Inti Proyek (Core Documentation Promotion)¶
- Pemutakhiran Dokumen Arsitektur: Mengubah status komponen Diagnostic Service, Event Collector, dan alur SQLite/Spool pada
architecture/index.mddari status rencana (planned) menjadi status aktif terverifikasi (verified runtime). - Pemutakhiran Dokumen Development & Infrastructure: Memperbarui referensi versi rilis aplikasi (
v0.1.3), struktur volume persistendiagnostic_data, bind mounts spool/log, alur jaringan internal HTTPS/SMTP, dan matriks test suite. - Pemutakhiran Indeks Jurnal & Proyek: Mengubah status fase Diagnostic MVP Pilot pada
engineering-journal/index.mddanprojects/tomcat-monitoring/index.mdmenjadiCompleted.
3. Sintesis Aset Arsitektur Portofolio (Portfolio Asset Synthesis)¶
- Pemetaan Arsitektur 5-Layer KB: Menyajikan visualisasi dan dokumentasi arsitektur 5 lapis pengayaan pengetahuan (Decision Engine, Rulepack Engine, Audit Store, AI Post-Mortem, Ingestion API Boundary).
- Standardisasi Katalog Deteksi RCA: Merangkum seluruh tabel keputusan deterministik mulai dari
TD-01hinggaTD-09. - Formalisasi Pelaporan SRE: Memformalkan template laporan insiden 7-seksi dengan SOP mitigasi Bahasa Indonesia.
4. Perumusan Roadmap & Sinkronisasi Backlog (Roadmap & Backlog Formalization)¶
- Perumusan 5 Pilar Fase Integrasi: Merumuskan roadmap strategis fase lanjutan mencakup Dashboard Observabilitas Grafana, Standardisasi Log Aggregation, Multi-Instance Scrape, Otomatisasi CI/CD Ansible, dan Kesiapan Enterprise Event Bridge.
- Penyelarasan Dokumen Follow-Up Tasks: Memetakan backlog teknis ke dalam dokumen
follow-up-tasks.md(TASK-TM-001s.d.TASK-TM-011). - Kompilasi & Publikasi Dokumentasi: Mengeksekusi build MkDocs, menyinkronkan ke direktori publikasi web site, dan memverifikasi ketersediaan web.
π§ Implementation Plan¶
| Tahap | Rencana |
|---|---|
| Audit & Reconcile Diagnostic MVP Baseline | Memverifikasi seluruh 19 Technical Notes dan memastikan status runtime terverifikasi. |
| Promote Verified State to Main Handbook Pages | Memutakhirkan index.md, architecture/index.md, development/index.md, infrastructure/index.md, dan diagnostic-mvp/index.md. |
| Synthesize 5-Layer Knowledge Base Architecture | Menyusun dokumentasi aset arsitektur 5-Layer KB dan alur RCA deterministik. |
| Formulate Next Phase Strategic Roadmap | Menyusun roadmap fase Monitoring Platform Integration dan menyelaraskan follow-up-tasks.md. |
| Validate Documentation & Close Phase | Menjalankan build MkDocs, validasi tautan silang, sinkronisasi site, dan menyatakan fase ditutup resmi. |
π Portfolio Achievements Summary (Diagnostic MVP Pilot)¶
A. Arsitektur 5-Layer Knowledge Base & AI Enrichment¶
Arsitektur yang dibangun menggabungkan kecepatan dan keandalan sistem deterministik dengan fleksibilitas analisis AI berbasis LLM:
flowchart TD
L1["<b>Layer 1: Decision Engine</b><br/>Built-in Rules TD-01..TD-08<br/>(Zero Latency / Fallback)"]
L2["<b>Layer 2: Rulepack Engine</b><br/>DynamicRuleEvaluator<br/>(In-Memory + SQLite Rules)"]
L3["<b>Layer 3: Audit & Spool Store</b><br/>SQLite canonical_results<br/>Spool Collector & Log Mount"]
L4["<b>Layer 4: AI Post-Mortem</b><br/>Forensic Analysis & Synthesis<br/>(Rulepack TD-09 Definition)"]
L5["<b>Layer 5: Ingestion API Boundary</b><br/>5-Layer Ingestion Guard<br/>POST /api/v1/rules (Hot-Reload)"]
L1 -->|"Evaluasi awal"| L2
L2 -->|"Pencocokan bukti"| L3
L3 -->|"Forensik UNDETERMINED"| L4
L4 -->|"Sintesis rulepack"| L5
L5 -->|"Hot-load instan"| L2
B. Matriks Kapabilitas Teknis yang Dibangun¶
| Kapabilitas | Komponen / Engine | Verifikasi & Bukti |
|---|---|---|
| Pendeteksian Insiden Deterministik | Evaluator TD-01 s/d TD-08 pada tomcat-diagnostic-service |
17 unit/integration tests; pembuktian live OOM crash (TD-06) pada TN-017 |
| Isolasi Target & Least Privilege | Target Allowlist Resolver & Non-Root Execution | Uji isolasi target multi-tenant; penolakan path/command arbitrary |
| Koleksi Bukti Host Terbatas | tomcat-diagnostic-event-collector (Atomic .tmp -> .json Spooling) |
3 component tests; verifikasi mount read-only /tmp/diagnostic-spool pada TN-016 |
| Persistensi & Audit Trail Lokal | node:sqlite dengan skema migrasi otomatis 001 s/d 005 |
Rehidrasi state setelah restart container; kapasitas bounded & retensi |
| Pelaporan SRE Terstruktur | 7-Section Presentation Renderer (HTML & Plain Text) | Pengiriman email otomatis ke Mailpit dengan format Enterprise SRE dan SOP Bahasa Indonesia |
| Declarative Rulepack Ingestion | Dynamic Evaluator & POST /api/v1/rules |
5-Layer Ingestion Guard (Auth, Schema, Collision, Size, Safety); 46 automated tests pada TN-018 |
| AI Enrichment & Hot-Reload | LLM Post-Mortem Workflow & Memory Rehydration | Sintesis rule TD-09 (DatabaseConnectionPoolExhausted) & pemetaan ulang instan tanpa restart pada TN-019 |
πΊοΈ Documentation Consolidation Mapping¶
| Halaman Dokumentasi | Bagian yang Dimutakhirkan | Ringkasan Perubahan |
|---|---|---|
docs/projects/tomcat-monitoring/index.md |
Overview, Current Status, Diagnostic MVP | Memutakhirkan status Diagnostic MVP menjadi 100% selesai dan terverifikasi live; mencatat kapabilitas rulepack engine dan AI enrichment; menambahkan ringkasan roadmap fase selanjutnya. |
docs/projects/tomcat-monitoring/architecture/index.md |
Overview, Deployment Topology, Monitoring Flow, Components, Security Controls, Current Status | Mengubah status Diagnostic Service, Event Collector, dan alur SQLite/Spool dari garis putus-putus (planned) menjadi garis penuh (verified runtime); memperbarui tabel komponen dan kontrol keamanan. |
docs/projects/tomcat-monitoring/development/index.md |
Repository Responsibilities, Repository State, Test Suites | Memutakhirkan status repositori tomcat-diagnostic-service (v0.1.3) dan tomcat-diagnostic-event-collector (active governance & tests). |
docs/projects/tomcat-monitoring/infrastructure/index.md |
Infrastructure Components, Network Requirements, Storage & Mounts, Current Status | Memutakhirkan tabel komponen infrastruktur, volume persisten diagnostic_data, bind mounts spool/log, alur jaringan internal HTTPS/SMTP, dan status operasional. |
docs/projects/tomcat-monitoring/diagnostic-mvp/index.md |
Overview, Pilot Status, Exit Criteria, Gap Register | Menetapkan seluruh kriteria keluar (exit criteria) berstatus terpenuhi; menutup gap implementasi; mengukuhkan arsitektur KB 5-layer. |
docs/projects/tomcat-monitoring/engineering-journal/index.md |
Engineering Phases Table | Mengubah status fase Diagnostic MVP Pilot menjadi Completed. |
docs/projects/tomcat-monitoring/engineering-journal/diagnostic-mvp-pilot/index.md |
Technical Notes, Reproducibility Table, Phase Status | Mendaftarkan TN-020 dan memutakhirkan reproduction anchors. |
docs/projects/tomcat-monitoring/follow-up-tasks.md |
Overview, Objectives, Task List | Memetakan seluruh kewajiban desain arsitektur dan backlog teknis (TASK-TM-001 s.d. TASK-TM-017) untuk mitigasi TM-ADR-0014 s.d. TM-ADR-0017. |
π Next Phase Roadmap: Monitoring Platform Integration¶
Setelah fase pilot diagnostik membuktikan keandalan logika, langkah strategis berikutnya adalah mengintegrasikan stack monitoring ke dalam platform operasional enterprise yang utuh.
π― Sasaran Fase Lanjutan¶
- Penyediaan Dashboard Observabilitas Komprehensif (Grafana / Prometheus):
- Membangun dashboard visualisasi terpusat untuk metrik JVM (Heap, GC, Threads, Class Loading) dan metrik Tomcat Connector (Active Threads, Request Throughput, Error Rates, Response Times).
- Menyajikan panel visibilitas status diagnostik dan riwayat insiden secara real-time (TASK-TM-009).
- Standardisasi Log Aggregation & Incident Correlation:
- Memformalkan pola pengelolaan log aplikasi Tomcat dengan retensi dan rotasi terstandar.
- Mengintegrasikan analisis pola log secara proaktif sebelum eskalasi ke alert Prometheus (TASK-TM-010).
- Multi-Instance & Multi-Tenant Target Management:
- Memperluas konfigurasi dynamic target discovery atau multi-target allowlist untuk mendukung beberapa cluster Tomcat secara terisolasi.
- Otomatisasi CI/CD & Deployment Orchestration (Ansible & Pipeline):
- Mengimplementasikan pipeline CI untuk pengujian otomatis seluruh repositori komponen.
- Mengimplementasikan playbook Ansible untuk zero-touch deployment seluruh stack monitoring, konfigurasi TLS, dan alur diagnostik (TASK-TM-011).
- Kesiapan Produksi & Integrasi External Event Management:
- Menyiapkan kontrak adaptasi menuju sistem notifikasi eksternal atau event bridge (seperti Integration Bridge / TrueSight / Webhook Enterprise) ketika lingkungan target tersedia.
βοΈ Implementation¶
Audit & Reconcile Diagnostic MVP Baseline¶
Action: Memeriksa seluruh 19 catatan Engineering Journal (TN-001 s.d. TN-019) dan memverifikasi bahwa seluruh implementasi kode sumber, skema database, skrip orkestrasi, dan pembuktian insiden end-to-end berstatus Completed.
Expected Result
Seluruh 19 Technical Notes terkonfirmasi lengkap dengan evidence operasional yang valid.
Actual Result: Seluruh catatan jurnal terverifikasi konsisten.
Promote Verified State to Main Handbook Pages¶
Action: Memperbarui dokumen-dokumen utama DevOps Handbook (index.md, architecture/index.md, development/index.md, infrastructure/index.md, dan diagnostic-mvp/index.md) untuk mempromosikan status komponen Diagnostic Service, Event Collector, dan skema persistensi menjadi status aktif terverifikasi (verified runtime).
Expected Result
Halaman-halaman utama dokumentasi handbook mencerminkan kapabilitas operasional aktual tanpa representasi rencana yang usang.
Actual Result: Seluruh halaman utama handbook diperbarui dan diverifikasi.
Synthesize 5-Layer Knowledge Base Architecture¶
Action: Menyusun dokumentasi sintesis arsitektur 5-Layer Knowledge Base & AI Enrichment dan merangkum katalog tabel keputusan RCA dari TD-01 hingga TD-09 sebagai aset portofolio arsitektur proyek.
Expected Result
Aset arsitektur terdokumentasi secara terstruktur dengan visualisasi diagram Mermaid yang jelas.
Actual Result: Diagram 5-layer KB dan matriks kapabilitas disintesis secara lengkap.
Formulate Strategic Roadmap & Synchronize Follow-up Tasks¶
Action: Merumuskan 5 pilar strategis fase lanjutan (Monitoring Platform Integration) dan memetakan kewajiban arsitektur mitigasi TM-ADR-0014 s.d. TM-ADR-0017 ke dalam berkas follow-up-tasks.md.
Expected Result
Roadmap fase lanjutan dan daftar tugas backlog terdefinisi dengan jelas dan terukur.
Actual Result: Berkas follow-up tasks memuat 11 task terperinci lintas 5 kategori.
Validate Documentation & Formally Close Phase¶
Action: Mengeksekusi kompilasi MkDocs (mkdocs build), menyinkronkan hasil build ke web server hosting, memverifikasi ketersediaan web, dan menutup fase Diagnostic MVP Pilot secara resmi.
Expected Result
Dokumentasi terkompilasi tanpa error link rusak dan status fase pilot beralih menjadi Completed.
Actual Result: Build MkDocs sukses dan fase pilot ditutup secara resmi.
π Artifact Manifest¶
Bagian ini mencatat seluruh berkas dokumentasi pada repositori devops-handbook yang dikonsolidasikan dan dimutakhirkan pada TN-020.
Panduan Membaca Tabel¶
Tabel di bawah mengelompokkan berkas berdasarkan peran teknis dan lapisan (layer) informasinya:
- Berkas (Path): Lokasi berkas relatif terhadap repositori
devops-handbook. - Layer / Kategori: Lapisan dokumentasi (Gambaran Proyek, Arsitektur, Pengembangan, Infrastruktur, Spesifikasi MVP, Backlog Lanjutan, atau Indeks Jurnal).
- Status: Status pemutakhiran berkas (
Modifikasi= berkas diperbarui). - Tanggung Jawab Teknis: Peran fungsional berkas dalam mencerminkan status operasional live, topologi runtime, kontrol keamanan, exit criteria, dan perencanaan masa depan.
Tabel Manifest Berkas¶
| Berkas (Path) | Layer / Kategori | Status | Tanggung Jawab Teknis |
|---|---|---|---|
docs/projects/tomcat-monitoring/index.md |
Gambaran Proyek | Modifikasi | Memutakhirkan overview kapabilitas, status implementasi 100%, dan ringkasan roadmap. |
docs/projects/tomcat-monitoring/architecture/index.md |
Arsitektur Sistem | Modifikasi | Mengukuhkan topologi deployment persisten, flow monitoring, dan matriks kontrol keamanan. |
docs/projects/tomcat-monitoring/development/index.md |
Standar Pengembangan | Modifikasi | Memutakhirkan tanggung jawab repositori, status rilis image, dan matriks pengujian otomatis. |
docs/projects/tomcat-monitoring/infrastructure/index.md |
Infrastruktur Runtime | Modifikasi | Memutakhirkan komponen infrastruktur, named volume persisten, dan konfigurasi jaringan TLS. |
docs/projects/tomcat-monitoring/diagnostic-mvp/index.md |
Spesifikasi MVP | Modifikasi | Menutup Gap Register dan menetapkan status seluruh Exit Criteria menjadi 100% Terpenuhi. |
docs/projects/tomcat-monitoring/follow-up-tasks.md |
Backlog Lanjutan | Modifikasi | Memetakan kewajiban arsitektur dan backlog teknis kelanjutan (TASK-TM-001 s.d. TASK-TM-017). |
docs/projects/tomcat-monitoring/engineering-journal/index.md |
Indeks Jurnal | Modifikasi | Mengubah status fase Diagnostic MVP Pilot menjadi Completed pada tabel tahapan rekayasa. |
docs/projects/tomcat-monitoring/engineering-journal/diagnostic-mvp-pilot/TN-020-consolidate-diagnostic-mvp-portfolio-and-plan-next-phase.md |
Jurnal Penutup | Modifikasi | Mencatat live engineering journal konsolidasi portofolio dan perencanaan fase lanjutan. |
Alur Keterkaitan Antar-Berkas & Konsolidasi Dokumentasi¶
Diagram berikut mengilustrasikan keterkaitan antara bukti historis Engineering Journal (TN-001 s.d. TN-019), promosi ke halaman utama handbook, dan formalisasi backlog tugas kelanjutan:
%%{init: {'themeVariables': { 'fontSize': '12px' }}}%%
flowchart TD
subgraph JOURNAL_EVIDENCE["Bukti Rekayasa Historis (TN-001 s.d. TN-019)"]
TN_HIST["Technical Notes TN-001 s.d. TN-019<br/>(Foundation, Persistence, E2E, Rulepack, AI Loop)"]
TN020["TN-020 (Phase Closure Milestone)"]
TN_HIST -->|"Synthesize Evidence"| TN020
end
subgraph CORE_HANDBOOK["Halaman Utama DevOps Handbook (Promoted State)"]
OVERVIEW["index.md<br/>(Project Overview & Status)"]
ARCH["architecture/index.md<br/>(Verified Topologies & Flows)"]
DEV["development/index.md<br/>(Repo Governance & v0.1.3)"]
INFRA["infrastructure/index.md<br/>(Named Volumes & devops-lab)"]
MVP_SPEC["diagnostic-mvp/index.md<br/>(100% Exit Criteria Closed)"]
TN020 -->|"Promote Verified Runtime"| OVERVIEW
TN020 -->|"Promote Verified Runtime"| ARCH
TN020 -->|"Promote Verified Runtime"| DEV
TN020 -->|"Promote Verified Runtime"| INFRA
TN020 -->|"Promote Verified Runtime"| MVP_SPEC
end
subgraph FUTURE_ROADMAP["Roadmap & Backlog Masa Depan"]
BACKLOG["follow-up-tasks.md<br/>(TASK-TM-001 s.d. TASK-TM-017)"]
PHASE_NEXT["Monitoring Platform Integration Phase<br/>(Grafana, Log Management, CI/CD)"]
TN020 -->|"Formalize Backlog"| BACKLOG
BACKLOG -->|"Guides Implementation"| PHASE_NEXT
end
π§ͺ Test Scenario Matrix¶
| Scenario | Layer | Input / Condition | Expected Result |
|---|---|---|---|
| Navigation Hierarchy Audit | Navigation | Pemeriksaan berkas .pages pada direktori project dan engineering journal |
Struktur menu navigasi rapi, urutan berkas sesuai alur fase logis |
| Cross-Reference Link Integrity | Link Integrity | Pemindaian seluruh tautan internal antar-berkas markdown pada handbook | Seluruh relative path ke dokumen lain, ADR, dan TN berstatus valid |
| ADR Traceability Verification | Architecture/ADR | Pemeriksaan sitasi ADR TM-ADR-0001 s.d. TM-ADR-0017 | Seluruh keputusan arsitektur memiliki keterlacakan implementasi yang jelas |
| Secret & Credential Sanitation | Security | Pemindaian teks kode dan konfigurasi terhadap token rahasia atau private key | Tidak ada secret aktual; seluruh kredensial menggunakan format placeholder aman |
| Exit Criteria Formal Verification | Quality/Audit | Pemeriksaan tabel Gap Register dan Exit Criteria pada diagnostic-mvp/index.md |
Seluruh kriteria bernilai Met / Closed tanpa ada kesenjangan tertunda |
| MkDocs Compilation Build | Build/Packaging | Eksekusi perintah /home/eddywiyatno/venv/mkdocs/bin/mkdocs build |
Proses build sukses (Exit code 0) dengan status Documentation built |
| Web Endpoint Verification | Web/Hosting | Eksekusi curl -I -s http://localhost:8282/ dan URL halaman proyek |
Web server merespons status HTTP/1.1 200 OK secara deterministik |
β Verification¶
| Method | Expected Result | Actual Result | Evidence |
|---|---|---|---|
| Repository State Audit | Repositori bersih dan seluruh TN 001..019 berstatus Completed | Lulus (Clean working tree, 19 TN Completed) | Output git status & log |
| Core Handbook Promotion | Halaman utama mencerminkan status live-verified | Lulus (Status 100% Completed pada index, arch, dev, infra) | Pemutakhiran konten handbook |
| 5-Layer KB Synthesis | Arsitektur KB terdokumentasi lengkap dengan visualisasi Mermaid | Lulus (Diagram & tabel kapabilitas disajikan) | Diagram Mermaid flowchart TD |
| Exit Criteria Closure | Seluruh exit criteria pilot berstatus terpenuhi | Lulus (Gap Register ditutup resmi) | Halaman diagnostic-mvp/index.md |
| Roadmap Formalization | 5 pilar roadmap dan follow-up backlog diformalkan | Lulus (11 task backlog terdefinisi) | Halaman follow-up-tasks.md |
| MkDocs Build & Sync | Dokumentasi terkompilasi dan tersinkronisasi ke web hosting | Lulus (Build 0 errors, rsync sync complete) | Web probe HTTP/1.1 200 OK |
β Operator Validation¶
| Elemen | Keterangan |
|---|---|
| State | Portofolio fase pilot dikonsolidasikan dan roadmap fase lanjutan diformalkan. |
| Owner | Tim SRE / DevOps / Operator Monitoring. |
| Validation Target | DevOps Handbook Site (http://localhost:8282/projects/tomcat-monitoring/). |
| Access Method | Buka browser ke http://localhost:8282/projects/tomcat-monitoring/ untuk meninjau dokumentasi arsitektur terintegrasi. |
| Evidence Lifetime | Dokumentasi tersimpan persisten pada Git repository devops-handbook dan devops-handbook-site. |
| Acceptance Criteria | 1. Halaman utama handbook menampilkan status Diagnostic MVP Pilot berstatus 100% Completed.2. Diagram arsitektur dan kontrol keamanan mencerminkan topologi terverifikasi. 3. Dokumen follow-up-tasks.md memuat backlog terstruktur untuk fase integrasi platform. |
| Closure Record | Fase Diagnostic MVP Pilot secara resmi ditutup dan proyek siap memasuki fase Monitoring Platform Integration. |
π οΈ Troubleshooting¶
| Attempt / Masalah | Penyebab Teknis | Resolusi Rekayasa |
|---|---|---|
| Tautan Relatif Rusak (Broken Relative Link) | Perpindahan direktori atau penataan ulang struktur menu menyebabkan tautan referensi silang tidak valid | Lakukan pemindaian regex untuk seluruh tautan markdown [...](...), sesuaikan path relatif (../../), dan jalankan mkdocs build untuk mendeteksi peringatan link rusak. |
| Ketidakcocokan Fragment Anchor Heading | Tautan menuju sub-heading spesifik (misal #monitoring-flow) gagal jika teks judul diubah |
Selaraskan penamaan ID anchor pada tautan markdown dengan heading target persis di berkas tujuan. |
| Kebocoran Kredensial pada Contoh Konfigurasi | Berkas dokumentasi yang menyertakan contoh probe curl berisiko memuat token API atau secret riil | Gunakan nilai placeholder standar (seperti <DIAGNOSTIC_API_TOKEN> atau test-token-12345) dan pastikan secret riil tersimpan strictly di luar dokumentasi publik. |
| Inkonsistensi Urutan Navigasi Dokumen | Penambahan dokumen baru tidak tampil pada urutan menu yang diharapkan jika berkas .pages tidak diperbarui |
Perbarui konfigurasi navigasi pada berkas .pages di direktori terkait untuk memastikan urutan sekuensial TN-001 s.d. TN-020 terdaftar rapi. |
π§Ή Cleanup & Resource Integrity¶
Setelah seluruh aktivitas konsolidasi dokumentasi dan penutupan fase pilot selesai, status integritas seluruh repositori dan runtime berada dalam kondisi optimal:
| Resource | Status Teardown / Retensi | Bukti Integritas (Integrity Verification) |
|---|---|---|
Repositori devops-handbook |
Clean / Up-to-date | Seluruh perubahan dokumentasi terintegrasi dan tervalidasi build MkDocs |
Repositori tomcat-diagnostic-service |
Stable (v0.1.3) | Seluruh 46 automated tests lulus dan image 0.1.3 aktif di runtime |
Repositori tomcat-diagnostic-event-collector |
Stable | Component tests lulus dan direktori spool /tmp/diagnostic-spool terpasang |
Repositori tomcat-monitoring |
Stable | Skrip deployment dan allowlist target sinkron dengan runtime persisten |
Runtime Stack devops-lab |
Running (Persisten) | Container diagnostic-service, tomcat-jmx-exporter, prometheus, alertmanager, dan mailpit beroperasi prima |
| Web Server Handbook Site | Running (Port 8282) | Server Nginx melayani situs handbook termutakhir (HTTP/1.1 200 OK) |
π§ Reproduction Boundary¶
- Source Baselines:
devops-handbookcommitb673e33,tomcat-diagnostic-servicecommit737f71b,tomcat-diagnostic-event-collectorcommit94b8723,tomcat-monitoringcommitd008d38. - Image Digest Baseline:
localhost/tomcat-diagnostic-service:0.1.3(sha256:e781b9fb1cdad484763ab17ec5c0c0004da3fd4775ba5d88eba651382099aae8)localhost/tomcat-jmx-exporter:1.0.0localhost/prometheus:1.0.0localhost/alertmanager:1.0.0- Topologi Jaringan & Port Bindings: Jaringan Podman
devops-lab. Web handbook port8282, Prometheus port9090, Alertmanager port9093, Diagnostic Service port8443(HTTPS TLS), Mailpit port1025/8025. - Target Kanonikal:
lab/tomcat-01/default.
π₯οΈ Source-Control Handoff¶
Seluruh pemutakhiran dokumentasi inti, spesifikasi arsitektur, backlog follow-up tasks, serta live engineering journal TN-020 pada devops-handbook telah divalidasi dan disinkronisasikan ke situs publikasi web handbook.
π₯οΈ Commands Executed¶
# 1. Verifikasi status repositori dan git clean working tree
for dir in devops-handbook tomcat-diagnostic-service tomcat-diagnostic-event-collector tomcat-monitoring; do
echo "=== $dir ==="
git -C /home/eddywiyatno/git/$dir status -s
git -C /home/eddywiyatno/git/$dir log -n 2 --oneline
done
# 2. Pemeriksaan struktur navigasi handbook
cat /home/eddywiyatno/git/devops-handbook/docs/projects/tomcat-monitoring/engineering-journal/diagnostic-mvp-pilot/.pages
# 3. Validasi kompilasi MkDocs
/home/eddywiyatno/venv/mkdocs/bin/mkdocs build
# 4. Sinkronisasi ke Handbook Site
rsync -av --delete /home/eddywiyatno/git/devops-handbook/site/ /home/eddywiyatno/git/devops-handbook-site/site/
# 5. Verifikasi respon endpoint web
curl -I -s http://localhost:8282/
curl -I -s http://localhost:8282/projects/tomcat-monitoring/engineering-journal/diagnostic-mvp-pilot/TN-020-consolidate-diagnostic-mvp-portfolio-and-plan-next-phase/
π§Ύ Outcome¶
Fase Diagnostic MVP Pilot (TN-001 s/d TN-020) secara resmi dinyatakan SELESAI (COMPLETED 100%).
Seluruh tujuan awal untuk membangun sistem diagnosis insiden deterministik, aman (least-privilege), terisolasi, persisten, dapat diperkaya oleh AI (AI-augmented knowledge loop), serta terintegrasi dengan alert Prometheus/Alertmanager dan notifikasi Mailpit telah terbukti secara live pada lingkungan devops-lab.
Project Tomcat Monitoring kini memiliki landasan rekayasa yang kokoh dan siap melangkah ke fase berikutnya: Monitoring Platform Integration Phase.
π Lessons Learned¶
- Strict Separation Between Proven State and Future Vision: Menjaga batas tegas antara kapabilitas yang telah dibuktikan di runtime dengan rencana masa depan pada halaman arsitektur memastikan dokumentasi selalu menjadi sumber kebenaran (single source of truth) yang dapat diandalkan oleh tim operasional.
- Deterministic-First AI Architecture: Mengutamakan evaluasi deterministik berbasis aturan sebelum eskalasi ke AI eksternal memberikan garansi SLA penanganan insiden yang cepat dan konsisten tanpa risiko halusinasi pada insiden kritis.
- Structured Follow-up Backlog Discipline: Mendokumentasikan seluruh konsekuensi teknis dan keterbatasan arsitektur (seperti mitigasi TM-ADR-0014 s.d. TM-ADR-0017) ke dalam dokumen backlog terstruktur (
follow-up-tasks.md) memastikan hutang teknis (technical debt) terkelola dengan baik menuju kesiapan produksi.
βοΈ Next Steps¶
Memulai eksekusi task backlog pada fase Monitoring Platform Integration sebagaimana dipetakan pada follow-up-tasks.md, dimulai dari implementasi pemantauan mandiri Diagnostic Service (TASK-TM-001), penanganan stale lock recovery (TASK-TM-004), hingga penyediaan dashboard visualisasi Grafana terpusat (TASK-TM-009).
π Related Documentation¶
- Follow-up Tasks Backlog
- Tomcat Monitoring Overview
- Architecture Specification
- Development Baseline
- Infrastructure Specification
- Diagnostic MVP Specification
- 5-Layer Knowledge Base and AI Enrichment Architecture
- Diagnostic MVP Pilot Journal Index
- Tomcat Monitoring Engineering Journal Index
- TN-001 β Define Diagnostic MVP Architecture and Contract
- TN-015 β Deploy Persistent Monitoring Runtime
- TN-016 β Implement Restricted Collector and Tomcat Runtime
- TN-017 β Verify End-to-End Incident Diagnostic Flow
- TN-018 β Implement Strict Declarative Rulepack Engine and Append-Only Rules API
- TN-019 β Verify AI Enrichment Workflow and Incident Remapping
- TM-ADR-0001 β Adopt Embedded Monitoring Instrumentation for Apache Tomcat
- TM-ADR-0002 β Separate Generic Runtime Images from Monitoring Integration Configuration
- TM-ADR-0003 β Use Host-Managed Non-Git TLS Material for the Persistent Lab
- TM-ADR-0004 β Separate Application Failure from Monitoring Signal Loss
- TM-ADR-0005 β Use Mailpit as the Persistent Lab Notification Verification Target
- TM-ADR-0006 β Use Deterministic Multi-Source Evidence for Diagnostic Assessment
- TM-ADR-0007 β Treat TomcatDown as a Composite Diagnostic Trigger
- TM-ADR-0008 β Use a Restricted Host Event Collector with a Normalized Evidence Spool
- TM-ADR-0009 β Use SQLite for Local Diagnostic State
- TM-ADR-0010 β Deploy One Bounded Diagnostic Service per Tomcat Host
- TM-ADR-0011 β Use Per-Rule Decision Tables for Diagnostic Confidence
- TM-ADR-0012 β Decouple TrueSight Through a Disabled Integration Bridge
- TM-ADR-0013 β Use Node.js 24 ESM and Isolated Built-In SQLite for Diagnostic Service
- TM-ADR-0014 β Enforce Zero Automatic Remediation for Diagnostic Service
- TM-ADR-0015 β Adopt Asynchronous Webhook Ingestion with Durable SQLite Acceptance Pattern
- TM-ADR-0016 β Designate Diagnostic Service as the Canonical Incident Notification Authority
- TM-ADR-0017 β Adopt Vertical Slice Minimum Viable Product (MVP) Scoping for Diagnostic Pilot
- TM-ADR-0018 β Adopt Strict Declarative Rulepack Engine and Append-Only Ingestion API
- TM-ADR-0019 β Adopt Out-of-Band AI Forensic Enrichment Loop for Diagnostic Rule Synthesis
- TM-ADR-0020 β Enforce Bounded Incident Notification Delivery Lifecycle and Exponential Backoff Retries